research: go-big lengths 0-16 eval (frozen, run) #137

Open
starsetbyte wants to merge 2 commits from research/gobig-s3-long-lengths-20261018 into research/gobig-s1-seeds-20261018
Owner

GOBIG-LONG_LENGTHS-FROZEN-001 (798caf4c…58d1). Eval-only of seeds/fit-001 on PL16 (N4, lengths 0-16, 30178 rows). Admitted arms gated_sharp_max, gated_soft (optional arms not admitted). Calibration 6.44 s; eval 271.1 s / 271.0 s / 398 MiB. See long_lengths/eval-001/SUMMARY.txt. Stacked on #133. Do not merge.

GOBIG-LONG_LENGTHS-FROZEN-001 (798caf4c…58d1). Eval-only of seeds/fit-001 on PL16 (N4, lengths 0-16, 30178 rows). Admitted arms gated_sharp_max, gated_soft (optional arms not admitted). Calibration 6.44 s; eval 271.1 s / 271.0 s / 398 MiB. See long_lengths/eval-001/SUMMARY.txt. Stacked on #133. Do not merge.
gobig_v1/long_lengths: PL16 eval
All checks were successful
checks / select relevant integrity checks (pull_request) Successful in 8s
checks / E01 candidate surface sufficiency (pull_request) Has been skipped
checks / DMS-003 protocol freeze integrity (pull_request) Has been skipped
checks / DMS-003 CPU successor integrity (pull_request) Has been skipped
checks / resource accounting and workflow consistency (pull_request) Has been skipped
checks / documentation integrity (pull_request) Successful in 7s
fa695e0cc0
All checks were successful
checks / select relevant integrity checks (pull_request) Successful in 8s
checks / E01 candidate surface sufficiency (pull_request) Has been skipped
checks / DMS-003 protocol freeze integrity (pull_request) Has been skipped
checks / DMS-003 CPU successor integrity (pull_request) Has been skipped
checks / resource accounting and workflow consistency (pull_request) Has been skipped
checks / documentation integrity (pull_request) Successful in 7s
This pull request can be merged automatically.
You are not authorized to merge this pull request.
View command line instructions

Checkout

From your project repository, check out a new branch and test the changes.
git fetch -u origin research/gobig-s3-long-lengths-20261018:research/gobig-s3-long-lengths-20261018
git switch research/gobig-s3-long-lengths-20261018

Merge

Merge the changes and update on Forgejo.

Warning: The "Autodetect manual merge" setting is not enabled for this repository, you will have to mark this pull request as manually merged afterwards.

git switch research/gobig-s1-seeds-20261018
git merge --no-ff research/gobig-s3-long-lengths-20261018
git switch research/gobig-s3-long-lengths-20261018
git rebase research/gobig-s1-seeds-20261018
git switch research/gobig-s1-seeds-20261018
git merge --ff-only research/gobig-s3-long-lengths-20261018
git switch research/gobig-s3-long-lengths-20261018
git rebase research/gobig-s1-seeds-20261018
git switch research/gobig-s1-seeds-20261018
git merge --no-ff research/gobig-s3-long-lengths-20261018
git switch research/gobig-s1-seeds-20261018
git merge --squash research/gobig-s3-long-lengths-20261018
git switch research/gobig-s1-seeds-20261018
git merge --ff-only research/gobig-s3-long-lengths-20261018
git switch research/gobig-s1-seeds-20261018
git merge research/gobig-s3-long-lengths-20261018
git push origin research/gobig-s1-seeds-20261018
Sign in to join this conversation.
No reviewers
No labels
R03
research-b
No milestone
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set

Reference
smolmodelco/thesmolmodelcompany!137
No description provided.