research: go-big study 1 — 10 seeds x 4 arms (frozen, run) #133

Open
starsetbyte wants to merge 2 commits from research/gobig-s1-seeds-20261018 into research/sharp-variant-20261018
Owner

GOBIG-SEEDS-FROZEN-001 (sha256 3e1db00a…bcd1). 10 seeds x 4 arms (baseline_sharp, gated_soft, gated_sharp_max, gated_sharp_mean), cap 300 (400 not admitted), panels PN5/PN8/PL (PN6/PN7 not admitted).
Receipts: calibration 12.37 s / 12.37 s CPU / 366 MiB; fit 209.2 s / 209.2 s / 305 MiB; eval 666.3 s / 666.2 s / 379 MiB. See seeds/eval-001/SUMMARY.txt. Shared frozen code for all five go-big studies. Do not merge.

GOBIG-SEEDS-FROZEN-001 (sha256 3e1db00a…bcd1). 10 seeds x 4 arms (baseline_sharp, gated_soft, gated_sharp_max, gated_sharp_mean), cap 300 (400 not admitted), panels PN5/PN8/PL (PN6/PN7 not admitted). Receipts: calibration 12.37 s / 12.37 s CPU / 366 MiB; fit 209.2 s / 209.2 s / 305 MiB; eval 666.3 s / 666.2 s / 379 MiB. See seeds/eval-001/SUMMARY.txt. Shared frozen code for all five go-big studies. Do not merge.
gobig_v1/seeds: calibration, admission (cap 300), fit-001, eval-001
All checks were successful
checks / select relevant integrity checks (pull_request) Successful in 7s
checks / E01 candidate surface sufficiency (pull_request) Has been skipped
checks / DMS-003 protocol freeze integrity (pull_request) Has been skipped
checks / DMS-003 CPU successor integrity (pull_request) Has been skipped
checks / resource accounting and workflow consistency (pull_request) Has been skipped
checks / documentation integrity (pull_request) Successful in 7s
f2ed3ab29a
All checks were successful
checks / select relevant integrity checks (pull_request) Successful in 7s
checks / E01 candidate surface sufficiency (pull_request) Has been skipped
checks / DMS-003 protocol freeze integrity (pull_request) Has been skipped
checks / DMS-003 CPU successor integrity (pull_request) Has been skipped
checks / resource accounting and workflow consistency (pull_request) Has been skipped
checks / documentation integrity (pull_request) Successful in 7s
This pull request can be merged automatically.
You are not authorized to merge this pull request.
View command line instructions

Checkout

From your project repository, check out a new branch and test the changes.
git fetch -u origin research/gobig-s1-seeds-20261018:research/gobig-s1-seeds-20261018
git switch research/gobig-s1-seeds-20261018

Merge

Merge the changes and update on Forgejo.

Warning: The "Autodetect manual merge" setting is not enabled for this repository, you will have to mark this pull request as manually merged afterwards.

git switch research/sharp-variant-20261018
git merge --no-ff research/gobig-s1-seeds-20261018
git switch research/gobig-s1-seeds-20261018
git rebase research/sharp-variant-20261018
git switch research/sharp-variant-20261018
git merge --ff-only research/gobig-s1-seeds-20261018
git switch research/gobig-s1-seeds-20261018
git rebase research/sharp-variant-20261018
git switch research/sharp-variant-20261018
git merge --no-ff research/gobig-s1-seeds-20261018
git switch research/sharp-variant-20261018
git merge --squash research/gobig-s1-seeds-20261018
git switch research/sharp-variant-20261018
git merge --ff-only research/gobig-s1-seeds-20261018
git switch research/sharp-variant-20261018
git merge research/gobig-s1-seeds-20261018
git push origin research/sharp-variant-20261018
Sign in to join this conversation.
No reviewers
No labels
R03
research-b
No milestone
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set

Reference
smolmodelco/thesmolmodelcompany!133
No description provided.