research: go-big baseline 800-update cap (frozen, run) #134

Open
starsetbyte wants to merge 2 commits from research/gobig-s4-baseline-long-20261018 into research/gobig-s1-seeds-20261018
Owner

GOBIG-BASELINE_LONG-FROZEN-001 (d6a54ba0…5442). baseline_sharp x 10 seeds, cap 800 (1000 not admitted at calibrated 0.043 s/update). Calibration 7.80 s; fit 296.6 s / 296.6 s / 304 MiB; eval 138.1 s / 138.1 s / 378 MiB. Same 2/10 fit as cap 300; the other 8 sit on a loss plateau (~0.446). Stacked on #133. Do not merge.

GOBIG-BASELINE_LONG-FROZEN-001 (d6a54ba0…5442). baseline_sharp x 10 seeds, cap 800 (1000 not admitted at calibrated 0.043 s/update). Calibration 7.80 s; fit 296.6 s / 296.6 s / 304 MiB; eval 138.1 s / 138.1 s / 378 MiB. Same 2/10 fit as cap 300; the other 8 sit on a loss plateau (~0.446). Stacked on #133. Do not merge.
gobig_v1/baseline_long: cap 800 fit + eval
All checks were successful
checks / select relevant integrity checks (pull_request) Successful in 9s
checks / E01 candidate surface sufficiency (pull_request) Has been skipped
checks / DMS-003 protocol freeze integrity (pull_request) Has been skipped
checks / DMS-003 CPU successor integrity (pull_request) Has been skipped
checks / resource accounting and workflow consistency (pull_request) Has been skipped
checks / documentation integrity (pull_request) Successful in 7s
7c08eb72e1
All checks were successful
checks / select relevant integrity checks (pull_request) Successful in 9s
checks / E01 candidate surface sufficiency (pull_request) Has been skipped
checks / DMS-003 protocol freeze integrity (pull_request) Has been skipped
checks / DMS-003 CPU successor integrity (pull_request) Has been skipped
checks / resource accounting and workflow consistency (pull_request) Has been skipped
checks / documentation integrity (pull_request) Successful in 7s
This pull request can be merged automatically.
You are not authorized to merge this pull request.
View command line instructions

Checkout

From your project repository, check out a new branch and test the changes.
git fetch -u origin research/gobig-s4-baseline-long-20261018:research/gobig-s4-baseline-long-20261018
git switch research/gobig-s4-baseline-long-20261018

Merge

Merge the changes and update on Forgejo.

Warning: The "Autodetect manual merge" setting is not enabled for this repository, you will have to mark this pull request as manually merged afterwards.

git switch research/gobig-s1-seeds-20261018
git merge --no-ff research/gobig-s4-baseline-long-20261018
git switch research/gobig-s4-baseline-long-20261018
git rebase research/gobig-s1-seeds-20261018
git switch research/gobig-s1-seeds-20261018
git merge --ff-only research/gobig-s4-baseline-long-20261018
git switch research/gobig-s4-baseline-long-20261018
git rebase research/gobig-s1-seeds-20261018
git switch research/gobig-s1-seeds-20261018
git merge --no-ff research/gobig-s4-baseline-long-20261018
git switch research/gobig-s1-seeds-20261018
git merge --squash research/gobig-s4-baseline-long-20261018
git switch research/gobig-s1-seeds-20261018
git merge --ff-only research/gobig-s4-baseline-long-20261018
git switch research/gobig-s1-seeds-20261018
git merge research/gobig-s4-baseline-long-20261018
git push origin research/gobig-s1-seeds-20261018
Sign in to join this conversation.
No reviewers
No labels
R03
research-b
No milestone
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set

Reference
smolmodelco/thesmolmodelcompany!134
No description provided.