Context fork qualified; complete adaptation pilot rejected by CPU admission #147

Merged
elsie merged 1 commit from research/adaptation-retention-pilot-20261019 into main 2026-10-19 06:55:02 +00:00
Member

The assessed adaptation/retention pilot was NOT_ADMITTED: measured full-protocol projection with the required 2x factor is 196.863216 CPU seconds, exceeding 162.5386524 remaining at admission. No final panel, 400-update pilot, or final adaptation/retention evaluation ran; coverage was not reduced.

Pins all ten continued #139 checkpoints and preserves their hashes. An isolated additive context-logit fork passed exact old-forward parity on 64 rows per size per seed, zero-old-loss gradient equivalence, and Q/shared-controller gradient checks. Twenty disposable development updates calibrated the complete unchanged design; development copies were discarded. This establishes implementation/gradient feasibility on fixtures, not successful adaptation, retention, learned binding, or a mechanism for the prior long-walk failures.

See research/adaptation_retention_v1/REPORT.md, CHECKPOINTS.json and retained evidence/calibration, admission, review and resource receipts. Supplied exact relations and the planned pure oracle/software remapping/corruption controls are explicit; no final paired seed/graph changes exist, and any future final panel remains a two-graph-cluster pilot. The uniform-Q intervention and separately unmeasured software-control timing are disclosed limitations.

Validation: 3 contract tests passed; all ten continued seeds qualified; 18,048 development raw rows and 140 historical hashes audited; 298 Markdown files passed; results ledger current at 30 runs. Fresh independent code/evidence/scientific wording review found no blocker.

Additional accounted cost: 20.2500013 CPU / 51.544055248 supervised worker-wall seconds. Cumulative ledger: 393.5505312 CPU / 569.325135592 wall seconds, within the same original 600/900 envelope and additional 180/300 ceilings. Prior conservative 5/5 charge remains included; control-plane writing/review/Git/API time excluded. All workers reaped; CPU-only, no installs/new costs/access expansion. Previous evidence/runtime packages unchanged.

This PR publishes a negative admission outcome and qualification artifacts. No further experiment or merge is initiated by this PR.

The assessed adaptation/retention pilot was NOT_ADMITTED: measured full-protocol projection with the required 2x factor is 196.863216 CPU seconds, exceeding 162.5386524 remaining at admission. No final panel, 400-update pilot, or final adaptation/retention evaluation ran; coverage was not reduced. Pins all ten continued #139 checkpoints and preserves their hashes. An isolated additive context-logit fork passed exact old-forward parity on 64 rows per size per seed, zero-old-loss gradient equivalence, and Q/shared-controller gradient checks. Twenty disposable development updates calibrated the complete unchanged design; development copies were discarded. This establishes implementation/gradient feasibility on fixtures, not successful adaptation, retention, learned binding, or a mechanism for the prior long-walk failures. See research/adaptation_retention_v1/REPORT.md, CHECKPOINTS.json and retained evidence/calibration, admission, review and resource receipts. Supplied exact relations and the planned pure oracle/software remapping/corruption controls are explicit; no final paired seed/graph changes exist, and any future final panel remains a two-graph-cluster pilot. The uniform-Q intervention and separately unmeasured software-control timing are disclosed limitations. Validation: 3 contract tests passed; all ten continued seeds qualified; 18,048 development raw rows and 140 historical hashes audited; 298 Markdown files passed; results ledger current at 30 runs. Fresh independent code/evidence/scientific wording review found no blocker. Additional accounted cost: 20.2500013 CPU / 51.544055248 supervised worker-wall seconds. Cumulative ledger: 393.5505312 CPU / 569.325135592 wall seconds, within the same original 600/900 envelope and additional 180/300 ceilings. Prior conservative 5/5 charge remains included; control-plane writing/review/Git/API time excluded. All workers reaped; CPU-only, no installs/new costs/access expansion. Previous evidence/runtime packages unchanged. This PR publishes a negative admission outcome and qualification artifacts. No further experiment or merge is initiated by this PR.
Record qualified context fork and CPU-rejected adaptation pilot admission
All checks were successful
checks / select relevant integrity checks (pull_request) Successful in 9s
checks / E01 candidate surface sufficiency (pull_request) Has been skipped
checks / DMS-003 protocol freeze integrity (pull_request) Has been skipped
checks / DMS-003 CPU successor integrity (pull_request) Has been skipped
checks / resource accounting and workflow consistency (pull_request) Has been skipped
checks / documentation integrity (pull_request) Successful in 9s
5f021eab44
elsie merged commit 54115897d1 into main 2026-10-19 06:55:02 +00:00
Sign in to join this conversation.
No reviewers
No labels
R03
research-b
No milestone
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set

Reference
smolmodelco/thesmolmodelcompany!147