docs(accordion): record RD1 close-out path and next gates #100

Closed
starsetbyte wants to merge 7 commits from docs/accordion-rd1-closeout-20261003 into main
Owner

Summary

Record the current discussion in a dated, reviewable folder under docs/accordion/:

  • 01-today-and-evidence.md separates documentation synthesis from experiment execution;
  • 02-rd1-closeout.md lays out the evidence-backed disposition needed to finish SMC-001 RD1 without manufacturing a positive result;
  • 03-accordion-sequence.md maps the gated reuse-first path from operation catalog to fixed Kev feasibility, retention, and only conditionally internal adaptive depth;
  • the parent Accordion README links the new packet.

The packet preserves the existing RD1, C1, DMS, and adjacent Vita evidence boundaries. It does not authorize a model download, GPU run, held-out evaluation, production change, or results-ledger row.

Verification

  • python3 scripts/check_docs.py — 112 Markdown files OK;
  • python3 scripts/build_results_ledger.py --check — ledger current, 24 runs;
  • git diff --check passed;
  • exact branch head: 2e0ee6b0685cf86f0df61a6eed732d592efd5add.

This is documentation work only and should be reviewed before landing.

## Summary Record the current discussion in a dated, reviewable folder under `docs/accordion/`: - `01-today-and-evidence.md` separates documentation synthesis from experiment execution; - `02-rd1-closeout.md` lays out the evidence-backed disposition needed to finish SMC-001 RD1 without manufacturing a positive result; - `03-accordion-sequence.md` maps the gated reuse-first path from operation catalog to fixed Kev feasibility, retention, and only conditionally internal adaptive depth; - the parent Accordion README links the new packet. The packet preserves the existing RD1, C1, DMS, and adjacent Vita evidence boundaries. It does not authorize a model download, GPU run, held-out evaluation, production change, or results-ledger row. ## Verification - `python3 scripts/check_docs.py` — 112 Markdown files OK; - `python3 scripts/build_results_ledger.py --check` — ledger current, 24 runs; - `git diff --check` passed; - exact branch head: `2e0ee6b0685cf86f0df61a6eed732d592efd5add`. This is documentation work only and should be reviewed before landing.
docs: map Accordion research, RD1 closure and reuse-first baselines
All checks were successful
checks / documentation integrity (pull_request) Successful in 6s
checks / E01 candidate surface sufficiency (pull_request) Successful in 5s
checks / DMS-003 protocol freeze integrity (pull_request) Successful in 6s
checks / DMS-003 CPU successor integrity (pull_request) Successful in 49s
cb4e28db93
docs(accordion): ground Decision/Routing in the lab's DMS lineage; second-reader fixes
All checks were successful
checks / documentation integrity (pull_request) Successful in 6s
checks / E01 candidate surface sufficiency (pull_request) Successful in 5s
checks / DMS-003 protocol freeze integrity (pull_request) Successful in 7s
checks / DMS-003 CPU successor integrity (pull_request) Successful in 50s
a2bcb7f761
docs(accordion): Kev-0.8B first under kev.serve; GGUF runtimes drop the decision head
All checks were successful
checks / documentation integrity (pull_request) Successful in 6s
checks / E01 candidate surface sufficiency (pull_request) Successful in 5s
checks / DMS-003 protocol freeze integrity (pull_request) Successful in 6s
checks / DMS-003 CPU successor integrity (pull_request) Successful in 50s
532cd0a258
docs(accordion): retract the v3 control-damage reading; carry C1 v4/v5
All checks were successful
checks / documentation integrity (pull_request) Successful in 6s
checks / E01 candidate surface sufficiency (pull_request) Successful in 5s
checks / DMS-003 protocol freeze integrity (pull_request) Successful in 5s
checks / DMS-003 CPU successor integrity (pull_request) Successful in 50s
04d4bc144a
The v3 control panel was generated at its own evaluation budget, so zero-state arms reproduce its 'damage' (self-audit at eb19366, reproduced by Eido). v4's matched random-macro control attributes the library's stream gain to mined content (approved at 35843da). v5 pre-registers a headroom panel and validity gate (e644b9c). The packet now carries the correction instead of the withdrawn reading, and the staged plan requires controls with margin, zero-state perturbation arms and pre-registered validity gates.
Cache & Distil (arXiv 2310.13561v1) and Online Cascade Learning (arXiv 2402.04513v3) already publish a small model that learns from its own escalations and escalates less over time, judged by lifetime quality/cost. Read in full: both trust the teacher label, learn answers on classification streams rather than procedures, do not measure retention, and fix learning inside the student. The candidate question, bottom line, novelty finding and retention-phase baselines now carry that; a neural-caching student is a required baseline.
docs(accordion): carry C1 v5's failed gate; controls need margin under perturbation
All checks were successful
checks / documentation integrity (pull_request) Successful in 5s
checks / E01 candidate surface sufficiency (pull_request) Successful in 5s
checks / DMS-003 protocol freeze integrity (pull_request) Successful in 6s
checks / DMS-003 CPU successor integrity (pull_request) Successful in 50s
272d8e4c5c
C1 v5 (3970ec0) regenerated the control panel with plain-order margin and failed its pre-registered gate: a zero-state 10% cost perturbation scored 0.14 against 0.90, needing a median 2,120 applications against 356 in plain order. The packet's control rule prescribed exactly that plain-order margin; it now requires keeping a control item only if it survives the declared perturbations when measured under them.
docs(accordion): record RD1 closeout path and next gates
All checks were successful
checks / documentation integrity (pull_request) Successful in 9s
checks / E01 candidate surface sufficiency (pull_request) Successful in 7s
checks / DMS-003 protocol freeze integrity (pull_request) Successful in 7s
checks / DMS-003 CPU successor integrity (pull_request) Successful in 50s
2e0ee6b068
Author
Owner

Closing this duplicate PR. Its unique dated RD1/Accordion packet is now carried by the existing PR #98 branch, updated to 4efe996abd84fdb610459a1a1ecab7c7761466dc; no unique change is lost.

Closing this duplicate PR. Its unique dated RD1/Accordion packet is now carried by the existing PR #98 branch, updated to `4efe996abd84fdb610459a1a1ecab7c7761466dc`; no unique change is lost.
starsetbyte closed this pull request 2026-10-04 00:33:26 +00:00
All checks were successful
checks / documentation integrity (pull_request) Successful in 9s
Required
Details
checks / E01 candidate surface sufficiency (pull_request) Successful in 7s
checks / DMS-003 protocol freeze integrity (pull_request) Successful in 7s
checks / DMS-003 CPU successor integrity (pull_request) Successful in 50s

Pull request closed

Sign in to join this conversation.
No reviewers
No labels
R03
research-b
No milestone
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set

Reference
smolmodelco/thesmolmodelcompany!100
No description provided.