research: gobig_v2 A — train on lengths 0-4 (stopped at admission) #138

Open
starsetbyte wants to merge 2 commits from research/gobig2-a-len4-20261018 into research/gobig-s1-seeds-20261018
Owner

gobig_v2 study A (len4) — STOPPED at admission (no fit/eval run)

Adds research/gobig_v2/ (round-2 driver gv2.py, admission, freeze, budget check, stdlib tests, dummy pipeline, precheck) and study A.

  • Design: train gated_sharp_max on all words of length 0-4 (sizes 4-6, 4 graphs/size, 1860 rows), 10 seeds, cap 200/150/100; eval PN8, PN16, PL16 (byte-identical to #133/#136/#137 panels).
  • Freeze GOBIG2-LEN4-FROZEN-001 e3010eba…a897. Pre-freeze: stdlib tests, precheck (vectorized evaluator gives JSON-identical scores to gobig_v1.run_panel on trained checkpoints; 2.6x faster), dummy pipeline for all three studies: PASS.
  • Calibration: 8.70 s wall / 8.65 s CPU / 450 MiB. step 0.105 s, eval per checkpoint PN8 2.42 / PN16 11.21 / PL16 3.33 s.
  • Admission: fit cap 200 admitted (proj 247 s), but eval not admitted: proj 205.9 s, 2x = 411.9 > 360 s CPU cap. Exit 1 -> study stopped per protocol, nothing patched (len4/FAILURE.json).
  • Re-running A needs a new freeze with eval CPU >= ~420 s and owner approval.

Base: #133 branch. Do not merge.

## gobig_v2 study A (len4) — STOPPED at admission (no fit/eval run) Adds `research/gobig_v2/` (round-2 driver `gv2.py`, admission, freeze, budget check, stdlib tests, dummy pipeline, precheck) and study A. - Design: train gated_sharp_max on all words of length 0-4 (sizes 4-6, 4 graphs/size, 1860 rows), 10 seeds, cap 200/150/100; eval PN8, PN16, PL16 (byte-identical to #133/#136/#137 panels). - Freeze GOBIG2-LEN4-FROZEN-001 `e3010eba…a897`. Pre-freeze: stdlib tests, precheck (vectorized evaluator gives JSON-identical scores to gobig_v1.run_panel on trained checkpoints; 2.6x faster), dummy pipeline for all three studies: PASS. - Calibration: 8.70 s wall / 8.65 s CPU / 450 MiB. step 0.105 s, eval per checkpoint PN8 2.42 / PN16 11.21 / PL16 3.33 s. - Admission: fit cap 200 admitted (proj 247 s), but **eval not admitted**: proj 205.9 s, 2x = 411.9 > 360 s CPU cap. Exit 1 -> study stopped per protocol, nothing patched (`len4/FAILURE.json`). - Re-running A needs a new freeze with eval CPU >= ~420 s and owner approval. Base: #133 branch. Do not merge.
gobig_v2/len4: calibration; admission FAILED (eval 2x proj 412 > 360); stopped
All checks were successful
checks / select relevant integrity checks (pull_request) Successful in 8s
checks / E01 candidate surface sufficiency (pull_request) Has been skipped
checks / DMS-003 protocol freeze integrity (pull_request) Has been skipped
checks / DMS-003 CPU successor integrity (pull_request) Has been skipped
checks / resource accounting and workflow consistency (pull_request) Has been skipped
checks / documentation integrity (pull_request) Successful in 7s
df08b35458
All checks were successful
checks / select relevant integrity checks (pull_request) Successful in 8s
checks / E01 candidate surface sufficiency (pull_request) Has been skipped
checks / DMS-003 protocol freeze integrity (pull_request) Has been skipped
checks / DMS-003 CPU successor integrity (pull_request) Has been skipped
checks / resource accounting and workflow consistency (pull_request) Has been skipped
checks / documentation integrity (pull_request) Successful in 7s
This pull request can be merged automatically.
You are not authorized to merge this pull request.
View command line instructions

Checkout

From your project repository, check out a new branch and test the changes.
git fetch -u origin research/gobig2-a-len4-20261018:research/gobig2-a-len4-20261018
git switch research/gobig2-a-len4-20261018

Merge

Merge the changes and update on Forgejo.

Warning: The "Autodetect manual merge" setting is not enabled for this repository, you will have to mark this pull request as manually merged afterwards.

git switch research/gobig-s1-seeds-20261018
git merge --no-ff research/gobig2-a-len4-20261018
git switch research/gobig2-a-len4-20261018
git rebase research/gobig-s1-seeds-20261018
git switch research/gobig-s1-seeds-20261018
git merge --ff-only research/gobig2-a-len4-20261018
git switch research/gobig2-a-len4-20261018
git rebase research/gobig-s1-seeds-20261018
git switch research/gobig-s1-seeds-20261018
git merge --no-ff research/gobig2-a-len4-20261018
git switch research/gobig-s1-seeds-20261018
git merge --squash research/gobig2-a-len4-20261018
git switch research/gobig-s1-seeds-20261018
git merge --ff-only research/gobig2-a-len4-20261018
git switch research/gobig-s1-seeds-20261018
git merge research/gobig2-a-len4-20261018
git push origin research/gobig-s1-seeds-20261018
Sign in to join this conversation.
No reviewers
No labels
R03
research-b
No milestone
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set

Reference
smolmodelco/thesmolmodelcompany!138
No description provided.