research: go-big 12/16-node eval (frozen, run) #136

Open
starsetbyte wants to merge 2 commits from research/gobig-s2-big-graphs-20261018 into research/gobig-s1-seeds-20261018
Owner

GOBIG-BIG_GRAPHS-FROZEN-001 (05b3ee9e…0cc6). Eval-only of seeds/fit-001 on PN12/PN16 (capacity 16, 48 graphs, lengths 0-4). Admitted arms: gated_sharp_max, gated_soft (baseline_sharp / gated_sharp_mean optional, not admitted). Calibration 4.83 s; eval 535.8 s / 535.7 s / 466 MiB. sharp_max L4 exact mean 0.995 at N=12 and N=16 (size-invariant); soft collapses (L4 0.012 / 0.008). Stacked on #133. Do not merge.

GOBIG-BIG_GRAPHS-FROZEN-001 (05b3ee9e…0cc6). Eval-only of seeds/fit-001 on PN12/PN16 (capacity 16, 48 graphs, lengths 0-4). Admitted arms: gated_sharp_max, gated_soft (baseline_sharp / gated_sharp_mean optional, not admitted). Calibration 4.83 s; eval 535.8 s / 535.7 s / 466 MiB. sharp_max L4 exact mean 0.995 at N=12 and N=16 (size-invariant); soft collapses (L4 0.012 / 0.008). Stacked on #133. Do not merge.
gobig_v1/big_graphs: 12/16-node eval
All checks were successful
checks / select relevant integrity checks (pull_request) Successful in 7s
checks / E01 candidate surface sufficiency (pull_request) Has been skipped
checks / DMS-003 protocol freeze integrity (pull_request) Has been skipped
checks / DMS-003 CPU successor integrity (pull_request) Has been skipped
checks / resource accounting and workflow consistency (pull_request) Has been skipped
checks / documentation integrity (pull_request) Successful in 7s
a418fa6969
All checks were successful
checks / select relevant integrity checks (pull_request) Successful in 7s
checks / E01 candidate surface sufficiency (pull_request) Has been skipped
checks / DMS-003 protocol freeze integrity (pull_request) Has been skipped
checks / DMS-003 CPU successor integrity (pull_request) Has been skipped
checks / resource accounting and workflow consistency (pull_request) Has been skipped
checks / documentation integrity (pull_request) Successful in 7s
This pull request can be merged automatically.
You are not authorized to merge this pull request.
View command line instructions

Checkout

From your project repository, check out a new branch and test the changes.
git fetch -u origin research/gobig-s2-big-graphs-20261018:research/gobig-s2-big-graphs-20261018
git switch research/gobig-s2-big-graphs-20261018

Merge

Merge the changes and update on Forgejo.

Warning: The "Autodetect manual merge" setting is not enabled for this repository, you will have to mark this pull request as manually merged afterwards.

git switch research/gobig-s1-seeds-20261018
git merge --no-ff research/gobig-s2-big-graphs-20261018
git switch research/gobig-s2-big-graphs-20261018
git rebase research/gobig-s1-seeds-20261018
git switch research/gobig-s1-seeds-20261018
git merge --ff-only research/gobig-s2-big-graphs-20261018
git switch research/gobig-s2-big-graphs-20261018
git rebase research/gobig-s1-seeds-20261018
git switch research/gobig-s1-seeds-20261018
git merge --no-ff research/gobig-s2-big-graphs-20261018
git switch research/gobig-s1-seeds-20261018
git merge --squash research/gobig-s2-big-graphs-20261018
git switch research/gobig-s1-seeds-20261018
git merge --ff-only research/gobig-s2-big-graphs-20261018
git switch research/gobig-s1-seeds-20261018
git merge research/gobig-s2-big-graphs-20261018
git push origin research/gobig-s1-seeds-20261018
Sign in to join this conversation.
No reviewers
No labels
R03
research-b
No milestone
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set

Reference
smolmodelco/thesmolmodelcompany!136
No description provided.